1993

Federal Ministry of Internal Affairs, Abuja

Investigation and report on power distribution supply and preparation of action plan, including load shedding recommendations, to prevent a recurrence

1993

OMPADEC, Port Harcourt

Survey relating to conversion of power station to Nohab-25 gas engine including assessment of comparative energy costs

1993

Ministry of Defence (Navy) Ojo Military Hospital, Ojo, Lagos State

Review of options and recommendations for the provision of unit protection on 6.6kV ring system

1993

Federal Ministry of Health, Lagos University Teaching Hospital, Idi-Araba, Lagos

Engineering services relating to the modification of 4 independent 500kVA 415V standby diesel generators for parallel operation with automatic start, synchronising and load control

1994

Ondo State Government, Akure

Engineering services relating to the upgrade of the power system at Ondo State water station, Akure, Ondo State

1994

WESTON Industry Ltd, Lagos

Investigation into suitability of recovered fuel for use in diesel generation project

1995

Nigerian Air Force Head Quarters, Lagos

Study of engine replacement of generating plant at Nigerian Air Force, Ikeja

1995

University of Port Harcourt Teaching Hospital, Port Harcourt

Technical audit of HV system, supply and installation of power transformer and equipment

1995

Obafemi Awolowo University, Ile-Ife, Osun State

Technical audit of 11MW diesel power installation at university campus

1996

Federal Ministry of Works, Lagos

Feasibility Study for replacement of 3×2.5MVA standby power diesel generators at Onitsha

1997

Federal Ministry of Education, Lagos

Fault level calculations for proposed Ilaro Polytechnic, Ilaro, Ogun State

1998

LDP General (Nig.) Ltd, Lagos

Investigation into the use of homogenisers for fuel treatment for diesel power station

2000

British High Commission

Supply, installation, maintenance and synchronising of 3x350KVA F.G. Wilson diesel generators.

2000

University of Ibadan, Oyo State

Installation of 11/33KV Power Station. Rehabilitation, Overhauling, Maintenance and electrification of Power Station of the entire Complex.

2000 to date

Various Organisations

Supplies and Installation of SDMO Generating Sets and High/Medium Voltage Equipment to Industries.

2003 to date

Globacom Ltd

Installation and Maintenance of Power Generators from 20-1500KVA to various MSC &BTS Stations. Commissioned and Ongoing.

2005

NEPA

Due Diligence on assets with KPMG. Technical lead on the assessment of the technical and operating elements on NEPAs installations that included stocktaking and a survey of serviceable inventory

2006

PHCN National Energy Development Project with World Bank

Conversion of Low Voltage Distribution System (LVDS) to High Voltage Distribution Systems (HVDS) for Lagos University Teaching Hospital (LUTH) – Okoh, Atunrase, Ogundana and Ishaga feeders – Federal Power station in Lagos. It involved the provision of 400KVA of power (960 transformers) and also the designing, manufacturing, installing & the commissioning & completion of certain facilities

2010

Sheraton Abuja

Supply and installation of 4MVA Power Generating plant. Provision of plant operation and maintenance.